Upgrade your production.

FIREBIRD™ Industrial Processing [FIP]

One FIP lane includes:

One [1] Washer-Extractor

Two [2] Dryers

☑ Up to 288 shirts/hour
☑ Reduced pretreat waste
☑ Dependable consistency

☑ Fewer operators
☑ One-stop source
☑ Easy to use

ACCELERATE YOUR EFFICIENCY

Features

Customized Programs

Optimized for DTG

Extract Speeds

5 - 1,000 RPM

Pretreatment Recycle System [PRS]

Low Waste

Maximum Capacity

Up to 288 Shirts/Hour*

FIREBIRD Support

(203)306-2988

Durability

Stainless Steel

SPEED | QUALITY | CONSISTENCY

CONSISTENT PERFORMANCE

Washer-Extractor

CALCULATED ACCESSIBILITY

Dryer

Why is FIP a better pretreat process?

Pretreat up to 288 shirts per hour with one FIP channel, which is 1 washer-extractor & 2 dryers. In addition, one person can effectively operate 3 FIP channels: 3 x 288 = 864 shirts per hour.

CheaterTee™ 

Using multiple lanes of the FIP System for production ranging from 500-3,000 shirts daily, we are able to offer an incredible range of brands and fabrics with notable usability that keeps our customers coming back. 

Testimonial

in partnership with 

*Approximate values for batch specifications vary based on climate, ventilation, and shirt material.

This shop is powered by Shopify